Qlogic SANbox 5602 Guide d'installation Page 58

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 228
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 57
4 – Installation
Installing a Switch
4-4 59096-00 A
0
4.2.2
Install Transceivers
The switch supports a variety of SFP and XPAK transceivers. To install a
transceiver, insert the transceiver into the port and gently press until it snaps in
place. To remove a transceiver, gently press the transceiver into the port to
release the tension, then pull on the release tab or lever and remove the
transceiver. Different transceiver manufacturers have different release
mechanisms. Consult the documentation for your transceiver.
CAUTION!
If the switch is mounted in a closed or multi-unit rack assembly,
make sure that the operating temperature inside the rack
enclosure does not exceed the maximum rated ambient
temperature. Refer to “Environmental” on page A-4.
Do not restrict chassis air flow. Allow 16 cm (6.5 in) minimum
clearance at the front and rear of the switch (surface mount) or
rack for service access and ventilation.
Multiple rack-mounted units connected to the AC supply circuit
may overload that circuit or overload the AC supply wiring.
Consider the power source capacity and the total power usage
of all switches on the circuit. Refer to “Electrical” on page A-4.
Reliable grounding in the rack must be maintained from the
switch chassis to the AC power source.
Note: The transceiver will fit only one way. If the transceiver does not install
under gentle pressure, flip it over and try again.
Vue de la page 57
1 2 ... 53 54 55 56 57 58 59 60 61 62 63 ... 227 228

Commentaires sur ces manuels

Pas de commentaire