1–Installation
12800-040 Installation
D000140-001 D 1-13
Installation Tasks
1. Install the clip nuts. Install M6 clip nuts in the following locations on EIA rails:
Figure 1-8. Clip Nut Installation Locations
For improved stability, orient the clip nuts as shown (that is, orient the
flanges horizontally):
Figure 1-9. Clip Nut Orientation
2. Install support rails in the rack. Fasten with two (2) M6 screws per EIA rail to
pre-installed clip nuts and torque to 30 in-lb.